2015
2015
Supercritical boiler was manufactured to the 800 MW unit for the Berezovskaya CPP.
Also in 2015 modernization of the gas-and-oil-fired boiler was performed for burning of pet coke for the Nizhnekamsk Heat Electric Generating Plant and the operations began on the project of Long Phu-1 TPP (Vietnam) as per ASME standards.